Foothill Gold Line 2014 Third Quarter Construction Newsletter

The 2014 Third Quarter issue of the Foothill Gold Line construction newsletter is now available for download. The Pasadena to Azusa project is 75% complete; and in this issue, you will find an overall project update, as well as in-depth information on how the light rail system is installed and how each street-level crossings is designed with the latest, state-of-the-art safety features.

Click below to download the Foothill Gold Line 2014 Third Quarter Construction Newsletter (PDF file size: <1 mb).

Leave a Reply

Your email address will not be published. Required fields are marked *