Gold Line Bridge Coverage on KPCC and KCRW
Check out the following two Gold Line Bridge radio stories that recently aired on KCRW’s “Which Way, LA?” and on…
Check out the following two Gold Line Bridge radio stories that recently aired on KCRW’s “Which Way, LA?” and on…
The following feature appears in the December 2012 edition of Arroyo Monthly Magazine. FUNCTIONAL ART The new Metro Gold Line…
The following Op-ed originally appeared in the 12/19/12 print edition of the Pasadena Star-News. Gold Line Bridge Captures Local Heritage,…
On Saturday, the Construction Authority celebrated the on-time, on-budget completion of the $18.6 million Gold Line Bridge. More than 350…
Gold Line Bridge in Arcadia is a massive piece of art This article originally appeared on KPCC’s website on December…
Earlier this week crews completed installation of the final reeds on the Gold Line Bridge baskets.
Crews have been removing track from the 11.5-mile corridor, including these cross-ties from the corridor through Monrovia.
Irrigation trenches are being dug as part of the final activities for the Gold Line Bridge.
Pasadena Star-News photographer Walt Mancini captured this photo of the Gold Line Bridge basket. Click here to link to his…
Andrew Leicester, Artist/Designer from Minnesota, visited the Metro Gold Line bridge Thursday, November 8, 2012. Leicester was the Metro Gold…