I Will Ride Blog

  • Where Will You Ride?
  • Archives
  • About
  • Sign-up for Updates
Where Will You Ride?
  • I Will Ride to Kaiser Sunset - Lari K from Glendora
  • I Will Ride to Huntington hospital - Roseann T from Glendora
  • I Will Ride to Memorial Park, work - Gary W from Azusa
  • I Will Ride to Union Station/Flyaway - Leigh R from San Dimas
  • I Will Ride to Pasadena, Downtown or West Los Angeles - Stan C from Duarte
  • I Will Ride to Cliftons cafeteria - Susan A from Monrovia
  • I Will Ride to El Monte - Renee S from Claremont
  • I Will Ride to Montclair to Memorial Park - Alan K from Upland
  • I Will Ride to Claremont - Anita F. T from Sierra Madre
  • I Will Ride to transfer to 61 Bus to ride to Ontario Airport, or to Pasadena or Disney Hall - Ron B from Claremont

Get ‘I will ride’ in Your Inbox


Archives

January 30, 2013

Photos: Azusa Gold Line Construction – SGV Tribune

This image gallery originally appeared in the San Gabriel Valley Tribune website on Tuesday, January 29, 2013. Photos: Azusa Gold…

Read more

Share Twitter Facebook

January 29, 2013

Concrete International Magazine features the Gold Line Bridge

This feature appears in the February 2013 print edition of Concrete International Magazine. Click here to view the complete story…

Read more

Share Twitter Facebook

January 25, 2013

Gold Line Bridge artist exhibition highlighted in KCET’s Artbound

KCET’s Artbound featured the Williamson Gallery’s “Pages” Exhibition in this recent post. This amazing artist showcase includes Gold Line Bridge…

Read more

Share Twitter Facebook

January 25, 2013

Construction Update and Picture of the Week

FTC crews completed work on the 5th Avenue bridge in Monrovia this week. An isolation structure was constructed to secure…

Read more

Share Twitter Facebook

January 23, 2013

Gold Line Keeps Getting Better – Curbed L.A.

The following blog post originally appeared on Curbed LA on January 18, 2013. Gold Line Keeps Getting Better When the…

Read more

Share Twitter Facebook

January 22, 2013

Metro to run more Gold Line trains every six minutes from 10 a.m. to 8 p.m. on weekends beginning Jan. 27 – The Source

The following blog post originally appeared on The Source on January 18, 2013. Metro to run more Gold Line trains…

Read more

Share Twitter Facebook

January 18, 2013

Construction Update, Picture of the Week and Closure Reminder

FTC crews move forward with third party utility relocation near the future Azusa-Alameda Gold Line station. REMINDER: Foothill Blvd (between…

Read more

Share Twitter Facebook

January 17, 2013

REMINDER: Full Closure of Foothill Blvd in Azusa on Friday Jan. 18 from 7pm-6am

REMINDER: Foothill Blvd (between Vernon Ave and Orange Ave) will be closed in both directions on Friday, January 18 from…

Read more

Share Twitter Facebook

January 16, 2013

Construction Update and Picture of the Week

Work at the Gold Line Operations Campus continues as crews install shoring columns for the facility’s north retaining wall.

Read more

Share Twitter Facebook

January 15, 2013

APTA President and CEO Releases State of the Public Transportation Industry

The following press release was originally posted by the American Public Transportation Association (APTA) on January 14, 2013: APTA President…

Read more

Share Twitter Facebook

« Previous 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 Next »

Get ‘I will ride’ in Your Inbox


Follow Us

Follow Us on Facebook Follow Us on Twitter Follow Us on Youtube” title= Follow Us on RSS

Follow Us on RSS

Twitter @iwillride

IWillRide
July 1

Crews are installing the falsework for the future light rail bridge over the Foothill Blvd./Grand Ave. intersection in Glendora. The falsework is the temporary support for the super-structure as it is built across the street. #TheJourneyContinues 🛤️

2
Reply on Twitter 1542937545058660357Retweet on Twitter 15429375450586603573Like on Twitter 154293754505866035712Twitter 1542937545058660357
IWillRide
June 30

📺 Watch this video to learn about the new light rail bridge being built over Lone Hill Ave. in Glendora. It is the largest of the 19 bridges being constructed as part of the Foothill Gold Line from Glendora to Pomona. #TheJourneyContinues 🛤️🌉
https://youtu.be/1tqjVsmvhB8

Reply on Twitter 1542654723353759744Retweet on Twitter 15426547233537597442Like on Twitter 15426547233537597445Twitter 1542654723353759744
IWillRide
June 30

🚧 CONSTRUCTION ALERT: Long-term full street closure of Grand Ave. (north of Foothill Blvd.) in Glendora begins Tuesday, July 5

Reply on Twitter 1542311453310324736Retweet on Twitter 15423114533103247362Like on Twitter 15423114533103247365Twitter 1542311453310324736
IWillRide
June 29

📺 Watch this video to learn about the new light rail bridge being built over Lone Hill Ave. in Glendora. It is the largest of the 19 bridges being constructed as part of the Foothill Gold Line from Glendora to Pomona. #TheJourneyContinues 🛤️🌉
https://youtu.be/1tqjVsmvhB8

Reply on Twitter 1542223889085763585Retweet on Twitter 15422238890857635851Like on Twitter 15422238890857635856Twitter 1542223889085763585
IWillRide
June 24

Crews are constructing crossovers as part of the light rail track system. Crossovers are sets of two track switches that will allow future light rail trains to switch between the two light rail tracks. #TheJourneyContinues 🛤️

2
Reply on Twitter 1540407741054734337Retweet on Twitter 1540407741054734337Like on Twitter 15404077410547343378Twitter 1540407741054734337
©2015 Metro Gold Line Foothill Extension Construction Authority. All Rights Reserved. Follow Us on Facebook Follow Us on TwitterFollow Us on Youtube Follow Us on RSS