Governor Brown signs AB 706
This article was originally posted on LA Times “LA Now” page, the original link could be found here. Gold Line…
This article was originally posted on LA Times “LA Now” page, the original link could be found here. Gold Line…
With the deep foundations nearly complete, the Construction Authority wants to provide you an update on the next steps of…
By the end of the week, all three of the deep foundations will be complete. Want to know what’s next…
The Federal Transit Administration has awarded the Construction Authority $6 million in federal grant funding for design and construction of…
For safety purposes during concrete pouring operations for the last of three 110-foot deep, 11-foot diameter foundations, all eastbound lanes…
For safety purposes during installation of the reinforcing steel cage for the last of three 110-foot deep, 11-foot diameter foundations,…
Nearly two dozen at-grade crossings are planned between Pasadena and Azusa. Each is individually designed with the latest safety equipment…
Two down and one to go. Crews completed work on the second of three deep foundations this week following installation…
The Construction Authority Board of Directors will be holding a meeting today (Wednesday, September 28, 2011) at 7:00 p.m. The…
For safety purposes during installation of the reinforcing steel cage for the second of three 110-foot deep, 11-foot diameter foundations,…